Negotiable
The date of payment from buyers deliver within days
Shanghai
Long-term effective
2020-10-30 05:57
404
Company Profile
Shanghai Yiying Crane Machinery Co., LtdBy certification [File Integrity]
Contact:yiying(Mr.)
Email:
Telephone:
Phone:
Area:Shanghai
Address:Shanghai
Website:http://www.hugolift.com/ http://yiying.dgmingdao.com/
Wide range of applications
Widely used in lifting various small heavy objects. It can also be used with cantilever cranes, form a logistics transportation system suitable for low-space operations, logistics transportation, lifting heavy machines in the machine room.
Multiple models:
1. Hook fixed up and down electric chain hoist,
2. Manual operation type with a push trolley
3. Electric operation type :walking left and right electric up and down
4. Low headroom (walking left and right, electric up and down ): save space, when lifting is limited, it can be customized to drive in sixe directions.
Main Core
1. Copper core motor
All copper coils provide stable power output, reduce energy consumption, optimized coil winding method, greatly increase heat dissipation area, fast conduction, low heat emission.
2. Manganese steel chain
Grade 80 manganese steel chain, quenching and refining large carrying capacity, solid durable.
Parameters
Model |
0.5-01S |
01-01S |
01-02S |
1.5-01S |
02-01S |
02-02S |
2.5-01S |
03-01S |
03-02S |
03-03S |
05-02S |
Capacity (T) |
0.5 |
1 |
1 |
1.5 |
2 |
2 |
2.5 |
3 |
3 |
3 |
5 |
Lifting Speed |
7.2 |
6.8 |
3.6 |
8.8 |
6.6 |
3.4 |
5.6 |
5.6 |
3.3 |
2.2 |
2.8 |
Motor Power |
1.1 |
1.5 |
1.1 |
3 |
3 |
1.5 |
3 |
3 |
3 |
1.5 |
3 |
Rotation grade |
1440 |
||||||||||
Travelling speed |
11m/min &20m/min |
||||||||||
Power supply |
3S 380V 50HZ |
||||||||||
Control voltage (v) |
24V 36V 48V |
||||||||||
No.of load chain |
1 |
1 |
2 |
1 |
1 |
2 |
1 |
1 |
2 |
3 |
2 |
Spec.of laod chain |
6.3mm |
7.1mm |
6.3mm |
10mm |
10mm |
7.1mm |
11.2mm |
11.2mm |
10mm |
7.1mm |
11.2mm |
Net weight (kg) |
47 |
65 |
53 |
108 |
108 |
73 |
115 |
115 |
131 |
85 |
145 |
I-beam(mm) |
75-125 |
75-178 |
75-178 |
82-178 |
82-178 |
82-178 |
100-178 |
100-178 |
100-178 |
100-178 |
112-178 |
Packages
1.Standard export carton box and plywood wooden box, and packed as your request also.
Matters needing attention
1. The electric hoist is used for the first time when connected to electricity. The total power supply only needs to connect 3 live wire, if the electric hoist does not respond or does not start, is also normal, because the electric hulu has a phase sequence protector, the phase sequence will not start, need to swap any two of the three live wires and reconnect them
2. The electric hoist has been refueled before leaving the factory, no need to refuel for the first use. Generally used for live months, according to the specific situation, oil the electric hoist again, chain oil should be added for the first use of the chain, otherwise it will cause the chain or sprocket and other accessories to wear.
3. The electric hoist comes with a limit, automatically cut off power when the cargo rises to the top . but it does not play a full control role, if you rushing top is caused by improper use, for a along time, it will cause the stopper to malfunction, the electric hoist is also easily broken, so pay attention to the top when operating, avoid prolonged collision or hit the limit multiple times.
4. The chain tail cannot be installed anywhere, just drop naturally in the chain bag, otherwise, it will jam the limit or even damage the gear box.
5. Running type initial installation, the body of the machine will tilt when empty, is normal, please rest assured.
http://www.hugolift.com/